HeadeBg

On-Going Projects

EPIC of New MP Steam Boiler, New DM water Plant and Associated Facilities at QP Refinery, Mesaieed.

Additional Info

  • Client Qatar Petroleum
  • Project Title

    EPIC of New MP Steam Boiler, New DM water Plant and Associated Facilities at QP Refinery, Mesaieed.

  • Year : 2019
  • Type : EPIC Projects
  • Project Details :

    Brief Scope:-

    Package 1:-
    1. To install one new standalone MP steam water tube boiler with a capacity of 60 PH and associated facilities including De-aerators to overcome the current QP Refinery steam and condensate system constraints.
    2. To install New Demineralization Plant and associated facilities, as per the findings and recommendations of the Feasibility Study Report for BFW.
    3. To change all piping materials exposed to demineralized water to Stainless Steel as detailed in the FEED P&ID’s
    4. To change the pH control/Neutralization system from caustic to a more suitable system.
    Package 2:-
    5. To carry out the Engineering and Procurement for the Demolition of existing 1No of MP Boiler and existing 3 Nos of LP Boilers and Accessories.

EPIC for hooking up of new KHUFF gas wells & Arab D gas cap recycling wells to respective production / injection facility at Dukhan.

Additional Info

  • Client Qatar Petroleum
  • Project Title

    EPIC for hooking up of new KHUFF gas wells & Arab D gas cap recycling wells to respective production / injection facility at Dukhan.

  • Year : 2019 - 22
  • Type : EPIC Projects
  • Project Details :

    Brief Scope:-

    Route survey, Design, and Detailed Engineering, Procurement, Installation, and Hook up of following wells to respective production / injection facilities through flow lines.

    Four (4) new Khuff production wells complete with all required facilities.

    Three (3) new Khuff production and injection wells complete with all required facilities.

    Injection flowlines with all required facilities for four (4) Khuff wells.

    Eight (6) Arab-D gas cap injector wells complete with all required facilities.

    Two (2) new Arab-D Gas Cap producer wells complete with all required facilities.

    Installation of two (2) no. new tie-in slots with isolation valves on the existing production header.

EPIC for diversion of ONSAG from Dukhan to Mesaieed through existing KHUFF gas pipeline: phase-2.

Additional Info

  • Client Qatar Petroleum
  • Project Title

    EPIC for diversion of ONSAG from Dukhan to Mesaieed through existing KHUFF gas pipeline: phase-2.

  • Year : 2018 - 20
  • Type : EPIC Projects
  • Project Details :

    Brief Scope:-



    Divert ONSAG to 36 inch Khuff gas pipeline from Station-N to Station-B.
    Divert Khuff Gas at medium pressure to the Sweet Fuel Gas (SFG) pipeline to Station-U
    New piping with flow meter from 36 inch SFG manifold to 16 inch ONSAG N to U pipeline at Station N.
    Extension of Station 72-SBV-41J plot to accommodate the new and future facilities.
    Refurbishment and provision of HIPPS, Gas Analyser, Gas filters, Pressure Control Systems & MOVs.
    Project involves working in 9 stations in Dukhan, Mesaieed and Doha involving, Civil, Structural, Pipe line, Piping, electrical, instrumentation, PLC Scada and DCS control system.
    Decommissioning and demolition, Integrity related piping modifications and instrumentation upgrade in all the above stations as required.

EPIC of Single Trip Transmitter Failures Causing Plant Trip (MOC 1304), ICS I/O Segregation to avoid Single Point (MOC 1305). PIC of Change Material of construction for ERG & IRG CS to SS 316 (MOC 1757) and upgrade PSV at 112% load (MOC 1373).

Additional Info

  • Client ORYX GTL
  • Project Title

    EPIC of Single Trip Transmitter Failures Causing Plant Trip (MOC 1304), ICS I/O Segregation to avoid Single Point (MOC 1305). PIC of Change Material of construction for ERG & IRG CS to SS 316 (MOC 1757) and upgrade PSV at 112% load (MOC 1373).

  • Year : 2018 - 19
  • Type : EPIC Projects
  • Project Details :

    Brief Scope:-



    Carry out the Detailed Engineering Design (DED), Procurement, Installation, Pre-commissioning, Commissioning of Single Trip Transmitter Failures Causing Plant Trip (MOC 1304) and ICS I/O Segregation to Avoid Single Point (MOC 1305).

    Carry out Procurement, Installation, Pre-commissioning and commissioning of change material of construction for ERG & IRG Carbon Steel (CS) to Stainless Steel (SS) 316 (MOC 1757) and Upgrade PSV at 112% load (MOC 1373).


    OryxProject1OryxProject2

EPIC for Fresh Cooling Water Exchangers in QG2

Additional Info

  • Client Qatar Gas
  • Project Title

    EPIC for Fresh Cooling Water Exchangers in QG2

  • Year : 2017 - 19
  • Type : EPIC Project
  • Project Details :

     

    To carry out Engineering, Procurement, Dismantling, Installation, Pre-commissioning, assistance in  commissioning and other services required to carry out the replacement of fresh cooling water exchangers 24/25 E608 A/B/C/D, 24/25 E609 A/B/C/D and 24/25 E610 in QG2 Train4 and Train5 respectively during Shutdown.

EPIC for Installation of Two (2) Granulators Units in CSP Location.

Additional Info

  • Client Qatar Gas
  • Project Title

    EPIC for Installation of Two (2) Granulators Units in CSP Location.

  • Year : 2017 - 20
  • Type : EPIC Project
  • Project Details :

     

    To Carry out Engineering, Procurement, Installation, construction, Testing, Pre-commissioning , commissioning and other services required for the installation of two (2) new granulator units in Common Sulphur Plant (CSP) facility.

Provision of Integrated Construction Services - CA-2572

Additional Info

  • Client Occidental Petroleum Of Qatar Ltd. (OXY)
  • Project Title

    CA-2572- Provision of integrated construction services

  • Year : 2016-21
  • Type : Call Off Service
  • Project Details :

    This contract covers fabrication, inspection, painting, delivery, load out and sea fastening of piping, structural works and other miscellaneous items onshore.

    Offshore provision of equipment and manpower for Mechanical Construction, hook-up, E&I personnel for cabling, testing, loop checking etc., on the clients vessels and platforms..

    We have also deputed our Engineers and Draughtsman to the clients office to carryout planning, prepare job cards etc. as well as supplying material controllers and warehouse personnel to the clients stores and warehouses.

EPIC for Replacement of SS Mix Field Instruments at QG Offshore

Additional Info

  • Client Qatar Gas
  • Project Title

    EPIC for Replacement of SS Mix Field Instruments at QG Offshore

  • Year : 2015 - 18
  • Type : EPIC Project
  • Project Details :

    Project scope consists of Engineering, Procurement and Installation of various Transmitters, Valves, etc at PU & PR platforms. WORK shall be completed in four phases:

     

    First phase for online replacement within 06 months from award of WORK ORDER and shall start installation and commissioning activities within one month from date of delivery. 

    Second phase for shutdown replacement during April’16 WH3/PR shutdown OR Opportunity window. 

    Third phase for shutdown replacement during April’17 PU Shutdown OR Opportunity window. 

    Fourth phase for shutdown replacement during April’18 PU Shutdown OR Opportunity window.

Procurement, Construction and Installation Service Contract

Additional Info

  • Client Ras Gas
  • Project Title

    Procurement, Construction and Installation Service Contract.

     

  • Year : 2014 - 19
  • Type : Call Of Service
  • Project Details :

     

    Procurement, Construction and Installation (PCI) Services for the purpose of modification, Installation, replacement, etc at various RASGAS facility locations including Onshore and Offshore locations.

Agreement for Maintenance Manpower Support Services

Additional Info

  • Client Dolphine Energy
  • Project Title

    Agreement for Maintenance Manpower Support  Services

  • Year : 2015-2019
  • Type : Call Of Service
  • Project Details :

    Brief Scope:

    Supply of manpower for onshore maintenance activities includes Mechanical Technicians, Metering Technicians and Supervisors.

Provision of Technical Support Services for Offshore Works

Additional Info

  • Client TOTAL E&P QATAR
  • Project Title

    Provision of Technical Support Services for Offshore Works

  • Type : Call Of Service
  • Project Details :

    Brief Scope:

    Scope of Work mainly consists of Providing Skilled/Multi-skilled labors or technicians to carry out day-to-day activities or maintenance activities in various parts of TEPQ Offshore Facilities. Onshore Piping & Structural fabrication is carried out on Call-off basis required for TEPQ offshore facilities.