On-Going Projects

EPIC for Fresh Cooling Water Exchangers in QG2

Additional Info

  • Client Qatar Gas
  • Project Title

    EPIC for Fresh Cooling Water Exchangers in QG2

  • Year : 2017 - 19
  • Type : EPIC Project
  • Project Details :

     

    To carry out Engineering, Procurement, Dismantling, Installation, Pre-commissioning, assistance in  commissioning and other services required to carry out the replacement of fresh cooling water exchangers 24/25 E608 A/B/C/D, 24/25 E609 A/B/C/D and 24/25 E610 in QG2 Train4 and Train5 respectively during Shutdown.

EPIC for Installation of Two (2) Granulators Units in CSP Location.

Additional Info

  • Client Qatar Gas
  • Project Title

    EPIC for Installation of Two (2) Granulators Units in CSP Location.

  • Year : 2017 - 20
  • Type : EPIC Project
  • Project Details :

     

    To Carry out Engineering, Procurement, Installation, construction, Testing, Pre-commissioning , commissioning and other services required for the installation of two (2) new granulator units in Common Sulphur Plant (CSP) facility.

EPIC For Creation Of Additional Slots Of Gas Lift Manifold For Tie Ins Of New Wells In Dukhan

Additional Info

  • Client Qatar Petroleum
  • Project Title

    EPIC For Creation Of Additional Slots Of Gas Lift Manifold For Tie Ins Of New Wells In Dukhan.

  • Year : 2016 - 18
  • Type : EPIC Project
  • Project Details :

    Brief Scope:

    The Contract is for provision of the engineering, procurement, installation,pre-commissioning & hand over of 74 Nos of Additional 3” Gas Slots along with the associated equipment, instrumentation & other items.

    Fabrication of 17 No of Skids Consisting of 74 slots and Dosing pump skid - 9 Nos. and Modification in 8 Nos. of existing skid.

    Piping of 1”, 2”, 3”, 8” & Fittings and Manual Valves.

    Control Valve, Pressure Transmitter, Temperature Transmitter with thermo well, Flow Transmitter, Orifice plate, Safety Relief Valve.

    Corrosion Coupon, Chemical Injection Quill.

    Installation of Slots Skids Khatiyah North, Khatiyah Main, Khatiyah South , Fahahil North , Fahahil Main , Fahahil south, Jaleha.

    Modification of DCS,ESD & F& G system. 

Expansion of Pilot CNG Refueling Station (ECRS) at Small & Medium Industries Zone

Additional Info

  • Client Qatar Petroleum
  • Project Title

    Expansion of Pilot CNG Refueling Station (ECRS) at Small & Medium Industries Zone

  • Year : 2016 - 17
  • Type : EPIC Project
  • Project Details :

    Brief Scope consists of following:

    Construction of new facility and modification to all the civil, architectural and structural facilities to facilitate the installation of CNG vendor package . Foundation of the equipment skid & packages.

    Shade structure for the dispenser area, compressor package, buffer storage and any other vendor supplied items requiring shading.

    Road & pavements to suit the layout drawings

    Laying of the fuel gas line approximately 400lm long.

    Provision of New instrument air compressor package to supply adequate and uninterrupted IA to the CNG Facility

    Construction of new substation ( 30m x12m ) containing equipment such as , 11kv Switch gear , Transformers, LV Switch boards, 240V AC UPS, 110V DC UPS,Distribution Boards, Miscellaneous Electrical Equipment ,Provision of Custody metering skid for the natural gas .,Provision of new   F&G /ESD system

Provision of Integrated Construction Services - CA-2572

Additional Info

  • Client Occidental Petroleum Of Qatar Ltd. (OXY)
  • Project Title

    CA-2572- Provision of integrated construction services

  • Year : 2016-21
  • Type : Call Off Service
  • Project Details :

    This contract covers fabrication, inspection, painting, delivery, load out and sea fastening of piping, structural works and other miscellaneous items onshore.

    Offshore provision of equipment and manpower for Mechanical Construction, hook-up, E&I personnel for cabling, testing, loop checking etc., on the clients vessels and platforms..

    We have also deputed our Engineers and Draughtsman to the clients office to carryout planning, prepare job cards etc. as well as supplying material controllers and warehouse personnel to the clients stores and warehouses.

Electrical, Instrumentation, Telecommunication, Control Systems, Fire & Gas Works

Additional Info

  • Client Qatar Solar Technology
  • Project Title

    Electrical, Instrumentation,  Telecommunication, Control Systems, Fire & Gas Works

     

  • Year : 2016 - 17
  • Type : E&I Project
  • Project Details :

     

    Procurement, fabrication & installation Structural Steel Installation, Cable Way/Ladders Conduit Installation.
    Equipment Panel Installation and testing (33 KV, 11 KV, 415 V Switchboards, transformers, DG, Bus duct etc.).
    Instruments installation and Tubing installation .
    Cable uncoiling and Installation.
    Cable Pulling – Includes Higher size cable.
    Cable Termination.
    Pre commissioning works (Leak Test, Loop testing, Testing of Equipment's).
    Commissioning & Start Up Assistance.

EPIC for Additional Water Storage at Jabel Tank Farm, Dukhan.

Additional Info

  • Client Qatar Petroleum
  • Project Title

    EPIC for Additional Water Storage at Jabel Tank Farm, Dukhan.

     

  • Year : 2014 - 16
  • Type : EPIC Project
  • Project Details :

     

    • Demolition of 2 Nos existing tanks
    • Construction of 2 Nos new Tanks
    • Construction of platforms and handrails
    • Construction of piping works
    • Construction of pipe supports
    • Carrying out foundation work of portable water Tanks.
    • Carrying out construction of Retaining Wall.
    • Relocation of fire water pump and related works.
    • Modification of scada system.
    • Electrical and instrumentaion  works.
    • Pre-Commissioning and Commissioning works.

    Additional  Watar Storage TankAdditional Watar Storage Tank PipingAdditional Watar Storage TankPiping for Additional Watar Storage TankRelated Piping of Additional Watar Storage Tank

EPIC for Replacement of SS Mix Field Instruments at QG Offshore

Additional Info

  • Client Qatar Gas
  • Project Title

    EPIC for Replacement of SS Mix Field Instruments at QG Offshore

  • Year : 2015 - 18
  • Type : EPIC Project
  • Project Details :

    Project scope consists of Engineering, Procurement and Installation of various Transmitters, Valves, etc at PU & PR platforms. WORK shall be completed in four phases:

     

    First phase for online replacement within 06 months from award of WORK ORDER and shall start installation and commissioning activities within one month from date of delivery. 

    Second phase for shutdown replacement during April’16 WH3/PR shutdown OR Opportunity window. 

    Third phase for shutdown replacement during April’17 PU Shutdown OR Opportunity window. 

    Fourth phase for shutdown replacement during April’18 PU Shutdown OR Opportunity window.

Procurement, Construction and Installation Service Contract

Additional Info

  • Client Ras Gas
  • Project Title

    Procurement, Construction and Installation Service Contract.

     

  • Year : 2014 - 19
  • Type : Call Of Service
  • Project Details :

     

    Procurement, Construction and Installation (PCI) Services for the purpose of modification, Installation, replacement, etc at various RASGAS facility locations including Onshore and Offshore locations.

Agreement for Maintenance Manpower Support Services

Additional Info

  • Client Dolphine Energy
  • Project Title

    Agreement for Maintenance Manpower Support  Services

  • Year : 2015-2019
  • Type : Call Of Service
  • Project Details :

    Brief Scope:

    Supply of manpower for onshore maintenance activities includes Mechanical Technicians, Metering Technicians and Supervisors.

Provision of Technical Support Services for Offshore Works

Additional Info

  • Client TOTAL E&P QATAR
  • Project Title

    Provision of Technical Support Services for Offshore Works

  • Type : Call Of Service
  • Project Details :

    Brief Scope:

    Scope of Work mainly consists of Providing Skilled/Multi-skilled labors or technicians to carry out day-to-day activities or maintenance activities in various parts of TEPQ Offshore Facilities. Onshore Piping & Structural fabrication is carried out on Call-off basis required for TEPQ offshore facilities.