EPIC for Dukhan Production Facilities Upgrade (DPFU) Phase 1A – Package-2
The EPIC scope of this package-2 includes the following major modifications to meet required future production requirements at Dukhan Production Faculties (Fahahil Sector, Khatiyah Sector, Jaleha Sector & PWI Stations).
- Replacement of 3 phase (1st Stage) production separators internals.
- Replacement and modification of existing Associated Gas Compressors.
- Replacement of tube/tube sheet of existing Crude/Hot Oil Heat Exchanger with upgraded MOC.
- Replacement of tube/header box for associated gas compressor intercoolers.
- Replacement of uncoated / unlined piping and pipelines at PWI pump stations.
- Replacement of existing manual valves at PWI pumps stations.
- Provision of two new 10” CS (HDPE lined) feeder pipelines from PS6 to PWI ring main.
- Carryout Detail engineering, HAZOP/HAZID Study, SIL/SAFOP Study, SAP/CMMS updates, Topography/UG Survey and Geotechnical Survey, etc.