EPIC for hooking up of new KHUFF gas wells & Arab D gas cap recycling wells to respective production / injection facility at Dukhan

Route Survey, Design, Detailed Engineering, Procurement, Installation, and Hook up of 21 wells to respective production/injection facilities through flow lines.

  • Four (4) new Khuff production wells complete with all required facilities.
  • Three (3) new Khuff production and injection wells complete with all required facilities.
  • Injection flowlines with all required facilities for four (4) Khuff wells.
  • Eight (6) Arab-D gas cap injector wells complete with all required facilities.
  • Two (2) new Arab-D Gas Cap producer wells complete with all required facilities.
  • Installation of two (2) no. new tie-in slots with isolation valves on the existing production header.