EPIC of New MP Steam Boiler, New DM water Plant and Associated facilities at QP Refinery, Mesaieed.
Package 1
- To install one new standalone MP steam water tube boiler with a capacity of 60 PH and associated facilities including De-aerators to overcome the current QP Refinery steam and condensate system constraints.
- To install New Demineralization Plant and associated facilities, as per the findings and recommendations of the Feasibility Study Report for BFW.
- To change all piping materials exposed to demineralized water to Stainless Steel as detailed in the FEED P&ID’s
- To change the pH control/Neutralization system from caustic to a more suitable system.
Package 2:
- To carry out the Engineering and Procurement for the Demolition of existing 1 No of MP Boiler and existing 3 Nos of LP Boilers and Accessories.