Projects
S.NO | PROJECT TITLE | CLIENT | CONTRACT NUMBER | DURATION | STATUS |
Onshore & Offshore Projects | |||||
1 | Cross country Pipeline | ||||
1.1 | EPIC for Provision of Facilities for Securing Gasoline Supply and Upgrade of Truck Loading Facilities for FIFA 2022 | QATAR PETROLEUM | GC20103300 | 26 Months | On going |
1.2 | EPIC for diversion of ONSAG from Dukhan to Mesaieed through existing Khuff Gas Pipeline: Phase – 2 | QATAR PETROLEUM | GC18101300 | 36 Months | On going |
1.3 | EPIC FOR INJECTION OF KHUFF GAS TO ARAB D GAS CAP USING NFIS | QATAR PETROLEUM | GC12107800 | 27 Months | Completed |
1.4 | EPIC FOR 16ӯ JET A1 PIPELINE FROM BSV3 TO NDIA | QATAR PETROLEUM | GT09106100 | 17 Months | Completed |
1.5 | MECHANICAL AND ERECTION WORKS FOR 18” MULTI PRODUCT PIPELINE (INCLUDING INSIDE THE WOQOD PLANT) | PUNJ LLOYD | GC07100500 | 12 Months | Completed |
2 | Brownfield Project | ||||
2.1 | EPIC for telemetry system replacement/ upgrade for MM & BH fields wellhead jackets | QATAR PETROLEUM | GC19102500 | 48 Months | On going |
2.2 | EPIC of Fast Rescue Craft & Boat Landings at NFA and Mooring Piles at PS-3 Field | QATAR PETROLEUM | GC19102700 | 15 Months | On going |
2.3 | EPC Services at Offshore – Replacement of CO2 Fire Suppression System PU-PR-LQ-WH3 | QG | LTC/C/EPM/3918/18 | 27 Months | On going |
2.4 | EPC SERVICE FOR EMERGENCY DIESEL GENERATOR AR BARZAN OFFSHORE PLATFORMS | QG | LTC-C-EPM-4049-19 | 24 Months | On going |
2.5 | EPC for Replacement of Cooling Water Exchanger U-E5570A at Offshore Pu Platform | QG-NORTH ( Offshore ) | LTC/C/VEN/2230/15 STC/C/VEN/3008/17 |
44 Months | On going |
2.6 | EPIC for Hooking up of new Khuff Gas Wells & Arab B Gas Cap Recycling Wells to respective production / Injection facility at Dukhan | QATAR PETROLEUM | GC18103500 | 46 Months | On going |
2.7 | EPC Service for Upgrade of Moisture Analyzer Sensor and Sampling System in TRAIN 1/2/3 at Offshore | QG | STC/C/VEN/3180/17 | 41 Months | On going |
2.8 | EPIC of Single Trip Transmitter Failures Causing Plant Trip (MOC 1304) and ICS I/O Segregation to Avoid Single Point (MOC 1305) | ORYX-GTL | TC-CN-006-18-EN | 16 Months | Completed |
2.9 | EPIC for Dukhan production facilities upgrade (DPFU) Phase-1A – Package 2 | QATAR PETROLEUM | GC19102200 | 36 Months | On going |
2.10 | EPC for Replacement of Fresh Cooling Water Exchangers in QG2 | QG | LTC/C/VEN/2615/16 | 59 Months | On going |
2.11 | EPIC for New MP Steam Boiler, New DM Water Plant and Associated Facilities at QP Refinery, Mesaieed | QATAR PETROLEUM | GC19100700 | 39 Months | On going |
2.12 | EPC FOR Q-CHEM DE-AERATOR SYSTEM UPGRADE | Q-CHEM ( Mesaieed ) | QC/TC/MP/24/19 | 28 Months | On going |
2.13 | EPC for Installation of TWO Granulator Units in CSP | QG | LTC/C/VEN/2378/15 | 47 Months | On going |
2.14 | Replacement of Rundown Metering Skids Coriolis Flow Meter in CCSL & CLPG | QG | LTC/C/FDE/4258/19 LTC/VEN/2230-F/13 |
20 Months | On going |
2.15 | EPC FOR THE MODIFICATION OF STACKER RECLAIMER TOWING ARM AND CABLE HANDLING ARRANGEMENT | QG | STC/C/EPM/4869/20 LTC/VEN/2230-F/13 |
12 Months | On going |
2.16 | Gallaf-2 Shop Fabrication of Structural & Piping (CS and SS) And Offshore Site Installation Support / Manpower Supply | SMOP | 4600000569 | 6 Months | On going |
2.17 | EPC For Two Combined Shutdown Projects in QG-2, QG-3 & QG-4 | QG | LTC/C/VEN/3189/A/17 | 44 Months | On going |
2.18 | EPIC For De-Aerator at NGL3, Upgrade of Propane Truck Loading System in NGL Plant and Flare Ko Drum (V8701) Draining Facility at NGL4, Mesaieed | QATAR PETROLEUM | GC18100600 | 28 Months | On going |
2.19 | EPC Service for New Preservation units for Spare Frame 9E motors and heat exchangers | QG | LTC/C/EPM/3542/18 | 32 Months | On going |
2.20 | Provision of Onshore Fabrication Services related to piping works for Gallaf HUC Project – Al Shaheen | PTSC | Ref 1502/PTSC POS-CPD dated 18/07/19 | 10 Months | Completed |
2.21 | Turnaround maintenance services for Khuff Plants, Station-N and Status-U in Dukhan Fields | QATAR PETROLEUM | GC19100600 | 12 Months | Completed |
2.22 | Inspection & Maintenance of Low Pressure Equipment during VINYL and LLDPE Turnaround 2020 | QAPCO | 1000000402 | 7 Months | Completed |
2.23 | Maintenance support services for 2021 major Shutdown at NFA and Al-Morjan | QATAR PETROLEUM | GC19108800 | 13 Months | On going |
2.24 | EPIC OF ADDITIONAL WATER STORAGE TANKS AT JABEL TANK FARM | QATAR PETROLEUM | GT14103800 | 29 Months | Completed |
2.25 | EPIC FOR NGL-3 AGRU 1&2 AMINE REGENERATORS AND ASSOCIATED EQUIPMENT REWAMP AT MESAIEED | QATAR PETROLEUM | GC13105400 | 28 Months | Completed |
2.26 | DOLPHIN TIE-IN TO THE COMMON SULPHUR PROJECT (CSP) | DOLPHIN ENERGY LTD. | ITT-DC-ONS-266 | 23 Months | Completed |
2.27 | EPIC OF LPG HYDROGENATION FACILITY AT ORYX-GTL PLANT AT RASLAFFAN | ORYX-GTL | EN-1218 | 11 Months | Completed |
2.28 | ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) OF MOC 186 AUTOSHUTOFF VALVE UNIT 20 FIRED HEATERS IN RASLAFFAN | ORYX-GTL | EN-1209 | 6 Months | Completed |
2.29 | EPIC OF FLEXIBLE INTERMEDIATE WAX TANK (MOC-415) AT RAS LAFFAN | ORYX-GTL | CN-057-10-EN | 16 Months | Completed |
2.30 | EPIC FOR CRUDE OIL IMPORT EXPORT FACILITIES UPGRADE AND BEACH LANDING VALVES AT HALUL | QATAR PETROLEUM | GT07101900 | 31 Months | Completed |
2.31 | EPIC FOR INSTALLATION OF FISCAL METER WITH PROVING FACILITY AT FSP PLANT | QATAR PETROLEUM | GC07102100/ VTC01 | 20 Months | Completed |
2.32 | REPLACEMENT OF RGT AUXILIARY MCC ON PS-2 & PS-3 | QATAR PETROLEUM | GC09104000 | 18 Months | Completed |
2.33 | REPLACEMENT OF MCCs AND DC POWER SUPPLIES FOR REFRIGERATION COMPRESSORS IN NGL-1 & 2 PLANTS, GAS OPERATIONS | QATAR PETROLEUM | GC09111500 | 14 Months | Completed |
2.34 | EPIC FOR BRIDGE SUPPORT PLATFORM HVAC UNITS REPLACEMENT AT NFA | QATAR PETROLEUM | LT07102300 / GC08109700 | 12 Months | Completed |
2.35 | EPIC FOR OIL STATION FLARE TIPS AND IGNITION SYSTEM REPLACEMENT AT PS-2 | QATAR PETROLEUM | GT07103700 | 14 Months | Completed |
2.36 | EPIC FOR REPLACEMENT OF THREE 1ST STAGE NGL-3 BOOSTER COMPRESSOR KNOCK OUT DRUMS AT MESAIEED | QATAR PETROLEUM | GTC 06/285/ED (EX-LTC 06/185) | 23 Months | Completed |
2.37 | INSTALLATION OF SURFACE CONTROLLED SUBSURFACE SAFETY VALVES ON SEVEN WELLS NEAR DUKHAN TOWNSHIP AND UMM BAB ROAD | QATAR PETROLEUM | GTC 05/115/ED (WCR NO. 1) | 12 Months | Completed |
2.38 | EPIC FOR REPLACEMENT OF FLARE TIP AT NFA | QATAR PETROLEUM | GC12112000 | 18 Months | Completed |
2.39 | EPIC FOR OILY WATER SYSTEM AT HALUL | QATAR PETROLEUM | GC11109100 | 27 Months | Completed |
2.40 | EPIC FOR CREATION OF ADDITIONAL SLOTS MANIFOLDS AT FMDS & KMDS IN DUKHAN | QATAR PETROLEUM | GC11109900 | 20 Months | Completed |
2.41 | EPIC FOR REPLACEMENT OF INSTRUMENT AIR COMPRESSOR AT PS-2 & PS-3 | QATAR PETROLEUM | GC10108100 | 21 Months | Completed |
2.42 | EPIC OF NEW LIFEBOATS & REPLACEMENT OF EXISTING LIFEBOATS AT PS-2/3 & NFA(PS-4) | QATAR PETROLEUM | GC09110600 | 15 Months | Completed |
2.43 | REPLACEMENT OF EXISTING ELECTROCHLORINATION PACKAGE AT UTPL WITH HIGHER CAPACITY WITH PIPELINE PROVISION TO SUPPLY SODIUM HYPOCHLORITE TO LQ AT NFA | QATAR PETROLEUM | GC09106500 | 12 Months | Completed |
2.44 | CONSTRUCTION WORKS FOR THE NEW H2S & CO2 REMOVAL UNIT | QATAR FERTILISER COMPANY (QAFCO) | RFQ-304513 | 11 Months | Completed |
2.45 | EPC WORKS FOR ELECTRICAL SYSTEMS REVAMP | QATAR FERTILISER COMPANY (QAFCO) | RFQ: 301017 | 2 Yearss | Completed |
2.46 | FABRICATION AND INSTALLATION OF FLUE GAS COOLER | Q-CHEM | QC/TC/T/008/09 | 6 Months | Completed |
2.47 | BOAT LANDING PROJECT | TOTAL E&P QATAR | TEPQ/T/02/2006 | 12 Months | Completed |
2.48 | EPC PLANT UPGRADE AND MODIFICATIONS | RASGAS | CT/RG16/L072/01 | 15 Months | Completed |
3 | Greenfield Project | ||||
3.1 | Expansion of Pilot CNG Refueling Station (ECRS) at Small and Medium Industries Zone( SAMI) | QATAR PETROLEUM | GC14113500 | 14 Months | Completed |
3.2 | ELECTRICAL, INSTRUMENTATION, TELECOMMUNICATION, CONTROL SYSTEMS, FIRE & GAS WORKS | QSTEC | QSTEC/LEGAL/ITT-2015/062 | 4 Months | Completed |
3.3 | RAS LAFFAN HELIUM RECOVERY UNIT | AIR LIQUIDE ENGINEERING | 512840 | 18 Months | Completed |
3.4 | EPIC OF CONTROL ROOM AT HALUL ISLAND | QATAR PETROLEUM | GTC 246/EF/04 | 24 Months | Completed |
3.5 | EPIC OF SEAWATER PUMP HOUSE AT HALUL | QATAR PETROLEUM | GTC 106/EF/04 | 13 Months | Completed |
3.6 | EPIC OF DIESEL FILLING STATION AND MINI NITROGEN PLANT AT HALUL ISLAND | QATAR PETROLEUM | GTC 06/116/EF | 15 Months | Completed |
3.7 | EPIC OF HSSD SYSTEM AT NFA AND WATER MIST SEPARATION SYSTEM AT PS2/3&NFA | QATAR PETROLEUM | GTC 244/EF/03 | 16 Months | Completed |
3.8 | ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING OF FAHAHIL NORTH FIELD COMPRESSION INJECTION STATION FLARE UPGRADE | QATAR PETROLEUM | GTC 169/ED/02 | 17 Months | Completed |
3.9 | ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING OF DUKHAN FLARE UPGRADE PROJECT | QATAR PETROLEUM | GTC 118/2000 | 24 Months | Completed |
4 | Plant Automation upgrade | ||||
4.1 | EPIC FOR UPGRADATION OF AC UPS UNITS NGL-3, MESAIEED | QATAR PETROLEUM | GC12105200 | 23 Months | Completed |
4.2 | EPIC FOR AUTOMATION UPGRADE AT FM, FS, FM, FSP & NFIS AT DUKHAN | QATAR PETROLEUM | GC12107300 | 20 Months | Completed |
4.3 | MAIN AUTOMATION CONTRACT | EMERSON PROCESS MANAGEMENT (HEIC) | EP-2 – 0016 | 24 Months | Completed |