Projects

S.NO PROJECT TITLE CLIENT CONTRACT NUMBER DURATION STATUS
Onshore & Offshore Projects
1 Cross country Pipeline 
1.1 EPIC for Provision of Facilities for Securing Gasoline Supply and Upgrade of Truck Loading Facilities for FIFA 2022 QATAR PETROLEUM GC20103300 26 Months On going
1.2 EPIC for diversion of ONSAG from Dukhan to Mesaieed through existing Khuff Gas Pipeline: Phase – 2 QATAR PETROLEUM GC18101300 36  Months On going
1.3 EPIC FOR INJECTION OF KHUFF GAS TO ARAB D GAS CAP USING NFIS QATAR PETROLEUM GC12107800 27 Months Completed
1.4 EPIC FOR 16”Ø JET A1 PIPELINE FROM BSV3 TO NDIA QATAR PETROLEUM GT09106100 17  Months Completed
1.5 MECHANICAL AND ERECTION WORKS FOR 18” MULTI PRODUCT PIPELINE (INCLUDING INSIDE THE WOQOD PLANT) PUNJ LLOYD GC07100500 12  Months Completed
2 Brownfield Project
2.1 EPIC for telemetry system replacement/ upgrade for MM & BH fields wellhead jackets QATAR PETROLEUM GC19102500 48  Months On going
2.2 EPIC of Fast Rescue Craft & Boat Landings at NFA and Mooring Piles at PS-3 Field QATAR PETROLEUM GC19102700 15  Months On going
2.3 EPC Services at Offshore – Replacement of CO2 Fire Suppression System PU-PR-LQ-WH3 QG LTC/C/EPM/3918/18 27 Months On going
2.4 EPC SERVICE FOR EMERGENCY DIESEL GENERATOR AR BARZAN OFFSHORE PLATFORMS QG LTC-C-EPM-4049-19 24  Months On going
2.5 EPC for Replacement of Cooling Water Exchanger U-E5570A at Offshore Pu Platform QG-NORTH ( Offshore ) LTC/C/VEN/2230/15
STC/C/VEN/3008/17
44 Months On going
2.6 EPIC for Hooking up of new Khuff Gas Wells & Arab B Gas Cap Recycling Wells to respective production / Injection facility at Dukhan QATAR PETROLEUM GC18103500 46  Months On going
2.7 EPC Service for Upgrade of Moisture Analyzer Sensor and Sampling System in TRAIN 1/2/3 at Offshore QG STC/C/VEN/3180/17 41  Months On going
2.8 EPIC of Single Trip Transmitter Failures Causing Plant Trip (MOC 1304) and ICS I/O Segregation to Avoid Single Point (MOC 1305) ORYX-GTL TC-CN-006-18-EN 16  Months Completed
2.9 EPIC for Dukhan production facilities upgrade (DPFU) Phase-1A – Package 2 QATAR PETROLEUM GC19102200 36  Months On going
2.10 EPC for Replacement of Fresh Cooling Water Exchangers in QG2 QG LTC/C/VEN/2615/16 59  Months On going
2.11 EPIC for New MP Steam Boiler, New DM Water Plant and Associated Facilities at QP Refinery, Mesaieed QATAR PETROLEUM GC19100700 39  Months On going
2.12 EPC FOR Q-CHEM DE-AERATOR SYSTEM UPGRADE Q-CHEM ( Mesaieed ) QC/TC/MP/24/19 28  Months On going
2.13 EPC for Installation of TWO Granulator Units in CSP QG LTC/C/VEN/2378/15 47 Months On going
2.14 Replacement of Rundown Metering Skids Coriolis Flow Meter in CCSL & CLPG QG LTC/C/FDE/4258/19
LTC/VEN/2230-F/13
20 Months On going
2.15 EPC FOR THE MODIFICATION OF STACKER RECLAIMER TOWING ARM AND CABLE HANDLING ARRANGEMENT QG STC/C/EPM/4869/20
LTC/VEN/2230-F/13
12  Months On going
2.16 Gallaf-2 Shop Fabrication of Structural & Piping (CS and SS) And Offshore Site Installation Support / Manpower Supply SMOP 4600000569 6  Months On going
2.17 EPC For Two Combined Shutdown Projects in QG-2, QG-3 & QG-4 QG LTC/C/VEN/3189/A/17 44  Months On going
2.18 EPIC For De-Aerator at NGL3, Upgrade of Propane Truck Loading System in NGL Plant and Flare Ko Drum (V8701) Draining Facility at NGL4, Mesaieed QATAR PETROLEUM GC18100600 28 Months On going
2.19 EPC Service for New Preservation units for Spare Frame 9E motors and heat exchangers QG LTC/C/EPM/3542/18 32 Months On going
2.20 Provision of Onshore Fabrication Services related to piping works for Gallaf HUC Project – Al Shaheen PTSC Ref 1502/PTSC POS-CPD dated 18/07/19 10  Months Completed
2.21 Turnaround maintenance services for Khuff Plants, Station-N and Status-U in Dukhan Fields QATAR PETROLEUM GC19100600 12  Months Completed
2.22 Inspection & Maintenance of Low Pressure Equipment during VINYL and LLDPE Turnaround 2020 QAPCO 1000000402 7  Months Completed
2.23 Maintenance support services for 2021 major Shutdown at NFA and Al-Morjan QATAR PETROLEUM GC19108800 13  Months On going
2.24 EPIC OF ADDITIONAL WATER STORAGE TANKS AT JABEL TANK FARM QATAR PETROLEUM GT14103800 29 Months Completed
2.25 EPIC FOR NGL-3 AGRU 1&2 AMINE REGENERATORS AND ASSOCIATED EQUIPMENT REWAMP AT MESAIEED QATAR PETROLEUM GC13105400 28 Months Completed
2.26 DOLPHIN TIE-IN TO THE COMMON SULPHUR PROJECT (CSP) DOLPHIN ENERGY LTD. ITT-DC-ONS-266 23  Months Completed
2.27 EPIC OF LPG HYDROGENATION FACILITY AT ORYX-GTL PLANT AT RASLAFFAN ORYX-GTL EN-1218 11  Months Completed
2.28 ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) OF MOC 186 AUTOSHUTOFF VALVE UNIT 20 FIRED HEATERS IN RASLAFFAN ORYX-GTL EN-1209 6  Months Completed
2.29 EPIC OF FLEXIBLE INTERMEDIATE WAX TANK (MOC-415) AT RAS LAFFAN ORYX-GTL CN-057-10-EN 16  Months Completed
2.30 EPIC FOR CRUDE OIL IMPORT EXPORT FACILITIES UPGRADE AND BEACH LANDING VALVES AT HALUL QATAR PETROLEUM GT07101900 31  Months Completed
2.31 EPIC FOR INSTALLATION OF FISCAL METER WITH PROVING FACILITY AT FSP PLANT QATAR PETROLEUM GC07102100/ VTC01 20  Months Completed
2.32 REPLACEMENT OF RGT AUXILIARY MCC  ON PS-2 & PS-3 QATAR PETROLEUM GC09104000 18  Months Completed
2.33 REPLACEMENT OF MCCs AND DC POWER SUPPLIES FOR REFRIGERATION COMPRESSORS IN NGL-1 & 2 PLANTS, GAS OPERATIONS QATAR PETROLEUM GC09111500 14  Months Completed
2.34 EPIC FOR BRIDGE SUPPORT PLATFORM HVAC UNITS REPLACEMENT AT NFA QATAR PETROLEUM LT07102300 / GC08109700 12  Months Completed
2.35 EPIC FOR OIL STATION FLARE TIPS AND IGNITION SYSTEM REPLACEMENT AT PS-2 QATAR PETROLEUM GT07103700 14  Months Completed
2.36 EPIC FOR REPLACEMENT OF THREE 1ST STAGE NGL-3 BOOSTER COMPRESSOR KNOCK OUT DRUMS AT MESAIEED QATAR PETROLEUM  GTC 06/285/ED (EX-LTC 06/185) 23 Months Completed
2.37 INSTALLATION OF SURFACE CONTROLLED SUBSURFACE SAFETY VALVES ON SEVEN WELLS NEAR DUKHAN TOWNSHIP AND UMM BAB ROAD QATAR PETROLEUM  GTC 05/115/ED (WCR NO. 1) 12 Months Completed
2.38 EPIC FOR REPLACEMENT OF FLARE TIP AT  NFA QATAR PETROLEUM GC12112000 18 Months Completed
2.39 EPIC FOR OILY WATER SYSTEM AT HALUL QATAR PETROLEUM GC11109100 27 Months Completed
2.40 EPIC FOR CREATION OF ADDITIONAL SLOTS MANIFOLDS AT FMDS & KMDS IN DUKHAN QATAR PETROLEUM GC11109900 20 Months Completed
2.41 EPIC FOR REPLACEMENT OF INSTRUMENT AIR COMPRESSOR AT PS-2 & PS-3 QATAR PETROLEUM GC10108100 21 Months Completed
2.42 EPIC OF NEW LIFEBOATS & REPLACEMENT OF EXISTING LIFEBOATS AT PS-2/3 & NFA(PS-4) QATAR PETROLEUM GC09110600 15 Months Completed
2.43 REPLACEMENT OF EXISTING ELECTROCHLORINATION PACKAGE AT UTPL WITH HIGHER CAPACITY WITH PIPELINE PROVISION TO SUPPLY SODIUM HYPOCHLORITE TO LQ AT NFA QATAR PETROLEUM GC09106500 12 Months Completed
2.44 CONSTRUCTION WORKS FOR THE NEW H2S & CO2 REMOVAL UNIT QATAR FERTILISER COMPANY (QAFCO) RFQ-304513 11 Months Completed
2.45 EPC WORKS FOR ELECTRICAL SYSTEMS REVAMP QATAR FERTILISER COMPANY (QAFCO) RFQ: 301017 2 Yearss Completed
2.46 FABRICATION AND INSTALLATION OF FLUE GAS COOLER Q-CHEM QC/TC/T/008/09 6 Months Completed
2.47 BOAT LANDING PROJECT TOTAL E&P QATAR TEPQ/T/02/2006 12 Months Completed
2.48 EPC PLANT UPGRADE AND MODIFICATIONS RASGAS CT/RG16/L072/01 15 Months Completed
3 Greenfield Project
3.1 Expansion of Pilot CNG Refueling Station (ECRS) at Small and Medium Industries Zone( SAMI) QATAR PETROLEUM GC14113500 14  Months Completed
3.2 ELECTRICAL, INSTRUMENTATION, TELECOMMUNICATION, CONTROL SYSTEMS, FIRE & GAS WORKS QSTEC QSTEC/LEGAL/ITT-2015/062 4  Months Completed
3.3 RAS LAFFAN HELIUM RECOVERY UNIT AIR LIQUIDE ENGINEERING 512840 18  Months Completed
3.4 EPIC OF CONTROL ROOM AT HALUL ISLAND QATAR PETROLEUM GTC 246/EF/04 24 Months Completed
3.5 EPIC OF SEAWATER PUMP HOUSE AT HALUL QATAR PETROLEUM GTC 106/EF/04 13 Months Completed
3.6 EPIC OF DIESEL FILLING STATION AND MINI NITROGEN PLANT AT HALUL ISLAND QATAR PETROLEUM GTC 06/116/EF 15 Months Completed
3.7 EPIC OF HSSD SYSTEM AT NFA AND WATER MIST SEPARATION SYSTEM AT PS2/3&NFA QATAR PETROLEUM GTC 244/EF/03 16 Months Completed
3.8 ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING OF FAHAHIL NORTH FIELD COMPRESSION INJECTION STATION FLARE UPGRADE QATAR PETROLEUM GTC 169/ED/02 17 Months Completed
3.9 ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING OF DUKHAN FLARE UPGRADE PROJECT QATAR PETROLEUM GTC 118/2000 24 Months Completed
4 Plant Automation upgrade
4.1 EPIC FOR UPGRADATION OF AC UPS UNITS NGL-3, MESAIEED QATAR PETROLEUM GC12105200 23 Months Completed
4.2 EPIC FOR AUTOMATION UPGRADE AT FM, FS, FM, FSP & NFIS AT DUKHAN QATAR PETROLEUM GC12107300 20 Months Completed
4.3 MAIN AUTOMATION CONTRACT EMERSON PROCESS MANAGEMENT (HEIC) EP-2 – 0016 24 Months Completed